Hi Folks... But of an unexpected break yesterday as I slept the day off !!
So today, we get back to the conversion.
We are hoping to get a large amount done today, as Lynne is with me, so progress should be steady as she has an impact on me, that keeps me going even when I am not well.
But first it's time open open yesterday deliveries and see what has arrived.
Well that was the plan until my mind n body decided it did not want to co-operate!.
So carefully crawled up the stairs and just made it to bed.
That was were I stayed for 3 hours, and I came back down a better person that had gone up the stairs.
Finally we get outside and in the back of the transit around 3pmish.....
The new Genuine Ford Fuel Filter and Housing unit has arrived, earlier than expected.
But we are happy it is here ready for Matt on Monday, to install.
Let us just hope Matt was right and it is this that is faulty.
These air vents are for the fridge/freezer/table unit, we are in the process of making now.
Again we was not expecting these till next week, but will make cutting the holes a lot easier this way as they can be cut out on the flat before screwing to the framework.
Brought this antenna for the transit, so we can listen to the radio.
I was not looking to buy just yet as wanted to get the engine up n running first.
But at less than a fiver, I clicked on buy it now button.
Again has arrived earlier than expected, and will get it on the roof, once we have the roof rack fitted.
Our first job of the day is to finish the front panel for the Fridge/Freezer/Table unit.
Unfortunately all sides are different, so it is build one side at a time.
But today, just the front will be done.
We screw all the batons together, but getting them square was bloody hard, as when square it would not fit snugly against the bed.
We need to make some alterations to the 2x1 baton,
The frame is about 1/4" away from the frame.
So we mark up 3/4" and then undo the screws, so we can make the adjustments.
and we screw the baton back in place.
It will need to be sanded straight before final assemby & paint.
But for now we need to make sure it fits and that the fridge freeze has space left between it and the baton.
we cut this 3mm ply board outside!
A big mistake as the wind was stronger than we thought, but as no room in the transit.
we have offered it up in place, as we still have some alterations to make, before it is ready to be attached to the side of the transit.
Unfortunately, I have had another accident, so we decided we would go indoors and have tea at the same time.
Hopefully getting back out later on.
Jobs to be done list !
I am restarting this list, as it proved popular before, and it helped to keep me focused on teh jobs started that were either waiting to be finished or were waiting on other items/jobs before they could be completed.
I will delete completed jobs a week after they are finished !
Green - Completed job
purple - job in progress
Yellow - Job Description/Update
Blue - new jobs added or not started
1. Get the engine up and running - waiting on parts
2. Paint bathroom sink back board - started 16/03
3. Measure & cut storage hole in 9mm ply for bed - started 24/03
4. put bathroom door frame back. -
5. add extra supports to mount the sink.
6. Panel the bulkhead battery frame work.
7. give all wood below the bed it's 2nd and final coat of paint.
8. Add Dodo insulation to were 2nd ceiling panel will go.
9. measure and cut the 3mm 3 ply sheet for the 2nd ceiling panel. started 25/03
10. need some material for bed header cover - use some DODO insulation as filler -
11. Paint Bathroom wall - Started 16/03
12. Make up back sink panel - Started 16/03
13. screw /clip 2nd ceiling panel into place.
14. make base for bathroom sink 9mm ply -
15. Lay the old tiles down under the bed....
16. Measure area and test fit Generator (remove when tested) -
17. add vinyl sheeting to table top.
18. install sink tap & waist pipe - REMOVED to install wall boarding
18A. 2nd panel run light wires thru roof frame. -
18B. 3rd panel run light wires thru roof frame. -
18C. 4th Panel run light wires thru roof frame. -
19. mount bathroom sink extra mounts -
20. re-assemble the framework onto raised toilet area -
21. remove grill from kitchen unit and repair and put back - Removed, Lynne has started washing it.
22. water pumps screw to back of kitchen unit -
23. remove sink and drainage board -
24 buy some sealant gaskets for kitchen unit and install - arrived - not yet ready to use
25. refit cooker & sink & drainage board -
26. measure n make foldable table. (cover for fridge/freezer) - Started 13/07
27. Cut out storage hole in bed side panel. - Started 24/03
28. needs sanding and prepping for painting white -
29. Paint the panel -
30. paint under the bed walls and framework - started 11/03
31. complete Freezer/fridge/table front frame and screw into place - started 13.07
32. cut and trim wall board that will sit behind the table & screw into place. 15/07
33. measure & cut dodo insulation and glue into place behind freezer/fridge/table.