Hi Folks.... - Another good day yesterday, fingers crossed today will be the same...
A steady day today.
Lynne n Michael managed to get the 2 x 8x4 foot 3 ply sheets out from the workshop, so we could carry on panelling.
All we have worked on today was panelling the bathroom wall and when we finished we are about 4" from were it needs to be..
I knew it was gonna be a tough job to do, but I had kinda hoped it would have been done and screwed into place by the end of the day.
But that was not meant to be.
Tomorrow I am on my own, as Lynne n Zoe are going to hair dressers and lunch n stuff together, so I do not know what I will get on with tomorrow.
Updated - Jobs pencilled in till Sunday
Boy has this list grown !!
Green - Completed job
purple - job in progress
Yellow - Jod Description
Blue - new jobs added or not started
1. Finish the frame work around the portaloo. - Finished!!
2. Add cross batons to bathroom/kitchen wall. - Finished!!
3. add sound proofing/insulation to bathroom/kitchen wall. - Finished!!
4. find position for sink in bathroom. - DONE
5. add extra supports to mount the sink. - hopefully be completed next Monday
6. Panel the bulkhead battery frame work.
7. Area next to passenger door, needs washing and going over with wire wool.
8. Finish adding sound proof pads - Still ongoing, need to move stuff around to get to the rest
9. Insulate Bathroom - Finished!!
10. Clean old original panels - Lynne has just about washed every panel she can get too so far
11. Glue extra Insulation in the inside of the kitchen panel. - Finished!!
12. Paint the Kitchen panel - Done
13. put them back were they belong. - behind Kitchen - done
14. make base for bathroom sink 9mm ply -
15. Mark out and cut inside bathroom wall 3mm ply - using the 3mm plyboard from workshop - started today
16. measure and cut 1st roof panel 3mm ply - It is up but not yet finished!
17. in 1st roof panel, cut holes for ceiling lights. - DONE
18. run light wires thru roof frame. - Done
19. Finally screw roof panel into place. - Waiting on some panel clips
20. mount bathroom sink extra mounts -
21. install sink tap & waist pipe - installed to sink - need more pipe!
22. add cross members to the bathroom wall were water pipe mounts will go - Finished!!
23. re-assemble the framework onto raised toilet area -
24. measure and cut 3mm panel for behind the toilet - Finished!!
25. insulate the panel and fix into place - Finished!!
26. - put bathroom door frame back. -
27. remove grill from kitchen unit and repair and put back - Removed
28. water pumps screw to back of kitchen unit -
29. remove sink and drainage board -
30 buy some sealant gaskets for kitchen unit and install - arrived today - not yet ready to use
31. refit cooker & sink & drainage board -
32. move kitchen to its final location - Now within an 1"
33. bolt the kitchen in place.
34. Glue extra Insulation in the inside of the drivers side rear wheel arch panel. - Done
35. Paint the Drivers side rear wheel panel -
36 - in workshop behind CBRTIM and get 2 x 3mm 8x4 foot sheets - DONE
35. Kev's workshop - Make some brackets and install roof rack on roof of transit. (Funds ring fenced) - Booked in on Tuesday 14th Feb.
36. Kev's workshop - If time and funds allow, get water tanks installed underneath and plumbed into the back. (have some funds available but I know it will not be enough!) - Booked in on Tuesday 14th Feb.
Double Bonus job, to have worked out and cut the bed frame & have it mounted!
The day started out with Lynne N Michael going down the workshop and they managed to get the 2 8x4 foot 3 ply sheets out and into the van :) :)
Which means we can get more done to the bathroom ...


The 2 8x4 feet 3ply sheets, Lynne n Michael brought up from the workshop for me..
I AM GONNA HAVE TO HAVE A TIDY UP,
So we can get inside the transit and do some work.

Some 30 mins later, I have had a move around and managed to get the 3 ply boards against the 9mm boards, and leave us room to work in.

I have tied up the loose wires, as we will be working in the bathroom again today.
In fact we will be in here all day long and possibly again tomorrow as well.

Seems kinda naked as we have removed the sink and put it away whilst we work on the wall.

We are marking the 1st sheet of 3 ply to get the rough lines and we will trim it in place.

Lynne is down on her knees measuring up the board for cutting.
Hopefully it will go pretty much straight in !
But then I had forgotten the lessons learned when I did the kitchen side of this wall...
We slide it in and it does not fit,

so we mark the board and sand or if it's a lot use the jigsaw,
but some 3 hours later and we are down to about 4" away from it's final position, but the cutting n sanding are still going ahead without any pause till 4pm when my moby & kindle go off telling us its time for my Med's.

What the wall boarded looks like so far,
Still loads of trimming to be done...
I was hoping that we would have this wall all screwed in place today, but I am not sure we will get that far...
Add comment
Comments