18th February 2023 - Disco Transit Green Long Wheel base and Hi Roof Conversion

Published on 19 February 2023 at 12:15

Hi Folks..... - Massively late start today.

as I did not wake up till 3pm !!

But Lynne has been busy.....

 

Updated - Jobs pencilled in till Sunday

Boy has this list grown !!

Green - Completed job

purple - job in progress

Yellow - Job Description
Blue - new jobs added or not started

 

1. Finish the frame work around the portaloo. - Finished!!
2. Add cross batons to bathroom/kitchen wall. -  Finished!!
3. add sound proofing/insulation to bathroom/kitchen wall. -  Finished!!
4. find position for sink in bathroom. - DONE
5. add extra supports to mount the sink. - hopefully be completed next Monday
6. Panel the bulkhead battery frame work.
7. Area next to passenger door, needs washing and going over with wire wool.
8. Finish adding sound proof pads - Still ongoing, need to move stuff around to get to the rest
9. Insulate Bathroom -  Finished!!
10. Clean old original panels - Lynne has just about washed every panel she can get too so far
11. Glue extra Insulation in the inside of the kitchen panel. -  Finished!!

12. Paint the Kitchen panel - Done 
13. put them back were they belong. - behind Kitchen - done

14. make base for bathroom sink 9mm ply - 

15. Mark out and cut inside bathroom wall 3mm ply - using the 3mm plyboard from workshop - started Friday

16. measure and cut 1st roof panel 3mm ply - It is up but not yet finished!
17. in 1st roof panel, cut holes for ceiling lights. - DONE
18. run light wires thru roof frame. - Done 12 volt & 220 volt lights & wires. Entrance
19. Finally screw roof panel into place. - Waiting on some panel clips
20. mount bathroom sink extra mounts - 

21. install sink tap & waist pipe - REMOVED to install wall boarding
22. add cross members to the bathroom wall were water pipe mounts will go -  Finished!!
23. re-assemble the framework onto raised toilet area - 
24. measure and cut 3mm panel for behind the toilet -  Finished!!

25. insulate the panel and fix into place -  Finished!!

26. - put bathroom door frame back. - 
27. remove grill from kitchen unit and repair and put back - Removed, Lynne has started washing it.
28. water pumps screw to back of kitchen unit - 
29. remove sink and drainage board - 
30 buy some sealant gaskets for kitchen unit and install - arrived - not yet ready to use
31. refit cooker & sink & drainage board -  
32. move kitchen to its final location - Now within an 1nch
33. bolt the kitchen in place.
34. Glue extra Insulation in the inside of the drivers side rear wheel arch panel. - Done

35. Paint the Drivers side rear wheel panel -  

36 - in workshop behind CBRTIM and get 2 x 3mm 8x4 foot sheets - DONE

 

 

39. Kev's workshop - Make some brackets and install roof rack on roof of transit. (Funds ring fenced) - Booked in on Tuesday 14th Feb.


39A. Kev's workshop - If time and funds allow, get water tanks installed underneath and plumbed into the back. (have some funds available but I know it will not be enough!) - Booked in on Tuesday 14th Feb.

 

Double Bonus job, to have worked out and cut the bed frame & have it mounted!

Lynne has washed the cooker, she still has some more cleaning to see if it can be made to look cleaner. 

Cooker grill and the grill base, have all been washed, but still require more cleaning, before we are ready to put them back in the kitchen unit..

Lynne has been busy with the electric planer, and what a good job she has done :) :) 

I have just got this bit at the top to sand back

And this bit at the bottom as well.

All small jobs, that I will add to my daily list to be done as filler jobs.

We have moved everything from the back into the bathroom for now, as we are gonna be working on this area next

I had forgotten about these 2 water tanks, so they get moved as well.

Lynne is wiping the surfaces down with a Tak cloth

and we get the 1st layer of foam insulation installed

Quickly followed with this panel, but we have run out of these pads.!

We will have a look, to make sure we do not have anymore hidden somewhere.

In goes the DODO sound insulation & Van Insulation 2 layers thick.

We have decided to use the original board, as 97% of the holes all line up.

Painting will be added to my list as a filler job.

We are now at the other side of the van, 
We have moved all the boarding and other timber so it is leaning on the kitchen for now.

None of these areas have been washed and Lynne says she will do tomorrow.

That is also the last of the sound deadening pads.
I will count up tomorrow, to see how many more I need.