18th March 2023 - Disco Transit Green Long Wheel base and Hi Roof Conversion

Published on 19 March 2023 at 07:14

Hi Folks.... - Not feeling to good..

But at least today I am up and about.

I am now trying to get up the go go juice and attempt to get back into the transit today.

In the hope that we can get something done.

This week has been another total disaster, and I do not seem to be able to change it.

Updated - Jobs pencilled in till Sunday

Boy has this list grown !!

I will delete completed jobs a week after they are finished !

Green - Completed job

purple - job in progress

Yellow - Job Description
Blue - new jobs added or not started

 

 

1. Buy more 2x3 from Andrews - Done 07/03

2. cut n fit bed head board panel to driver side side of van - Started 25/02

2B. . Measure & Cut front 9mm ply panel for bed - Started 25/02

3. Measure & cut storage hole in 9mm ply for bed - 

3B Fit & secure bed front 9mm panel - started 18/03

5. add extra supports to mount the sink. - hopefully be completed next Monday
6. Panel the bulkhead battery frame work.
7. glue foot panel board passenger side in place - Started 25/02

8. Get MDF from old bed from green shed and cut to fit the bed frame - 

9. Paint the Passengers side rear wheel panel -  started 11/02

10. need some material for bed header cover - use some DODO insulation as filler - 

11. Paint Bathroom wall - Started 16/03

12. Make up back sink panel - Started 16/03

13. inside kitchen cupboard by bed, need strengthening, so we can bolt the kitchen and the bed together -  Started 11/03

14. make base for bathroom sink 9mm ply - 

15. Paint bathroom sink back board - started 16/03

16. measure and cut 1st roof panel 3mm ply - just some clips to add
17. Finally screw roof panel into place. - Panel clips have arrived
18. install sink tap & waist pipe - REMOVED to install wall boarding

18A. 2nd panel run light wires thru roof frame. - 

18B. 3rd panel run light wires thru roof frame. - 

18C. 4th Panel run light wires thru roof frame. - 
19. scobby doo's for blue cover for Mattress to protect it. BROUGHT 10/03
20. mount bathroom sink extra mounts - 

21. bring mattress down, when bed frame is made

22. add mount points to transit frame for bed frame - started 11/03

23. re-assemble the framework onto raised toilet area - 
24. sand back to bottom of the bathroom wall, so panels match the upright

25. Paint the Drivers side rear wheel panel -  

26. - put bathroom door frame back. - 
27. remove grill from kitchen unit and repair and put back - Removed, Lynne has started washing it.
28. water pumps screw to back of kitchen unit - 
29. remove sink and drainage board - 
30 buy some sealant gaskets for kitchen unit and install - arrived - not yet ready to use
31. refit cooker & sink & drainage board -  
32. move kitchen to its final location - Now needs Bolting in place (25th/02)
33. bolt the kitchen in place. - Started 11/03
34. 

35. drivers side wheel wheel build framework & board over - Started 26/02 Framework finished - Just needs boarding.

37. Passenger side wheel wheel build framework & board over - Started 02/03

38. Cut passenger side floor batton.

39. Rear Drivers side sound proofed bottom half -  Finished!! 25/02
40. Added DODO insulation and more sound proofing -  Finished!! 25/02
41. Cut out storage hole in bed side panel. - 

42. needs sanding and prepping for painting white - 
43. Paint the panel - 
44. Buy large tin of white silk paint - done 10/03
45. cut 5 lengths for bed support - DONE 11/03

46. Paint the 5 lengths bed support - Done 18/03
47. Add guide lines for storage containers to floor - 
48. needs prepping for paint

49. Paint

50. paint under the bed walls and framework - started 11/03
51. 
52. Buy extra Containers needed for under bed storage. - 

53. Measure area and test fit Generator (remove when tested) -
54. 

39. Kev's workshop - Make some brackets and install roof rack on roof of transit. (Funds ring fenced) - Booked in on Wednesday 22nd March.


39A. Kev's workshop - If time and funds allow, get water tanks installed underneath and plumbed into the back. (have some funds available but I know it will not be enough!) - Booked in on Wednesday 22nd March.

 

Double Bonus job, to have worked out and cut the bed frame & have it mounted!

I have drilled the rear hole for the 10mm threaded bar, and I start to pull it together.
Lynne arrives just in time, to use a spanner on the nut that goes on the threaded bar in the grill..

They will need to be removed, when we put the grill sheeting back into the unit.

I have finished in here for now, so whilst Lynne is painting the bathroom wall.

We are hoping 3 coats of paint will cover the 3mm ply up nicely.

I measure up the bed head n foot rails, to make sure the bed is level, before I start to screw and bolt it into place.

The spacer 9mm ply board, needs about 2mm removed from the back and bottom

Finally the spacer board is sitting square, with some help from Lynne.
And I start to screw the bed side to the kitchen unit.

I have to dismantle the head end of the bed framework, as it does not quiet fit properly.

Now the bed head rail is sitting properly, 
I start to rebuild the wheel arch frame again, this time using some different lengths of 3x2

This L shaped framework is screwed into the framework.
(I still have to screw thru from the cabinet side to make it solid.

It is starting to come together at a steady pace

Lynne has been busy giving the bathroom wall 2 coats of paint

I will be cutting the threaded bar to length, once the paint has dried and we have made the sink shelf and support brackets

It has certainly made the bathroom a lot brighter and pleasant, 
Hopefully this will spur me on to get the bathroom finished.

Pill Alarm is going and I need to wash n change clothes, so we head indoors for 30 mins.,
and have a nice brew at the same time...

Just the top cross member to screw into place and this part is done and ready for painting.

So now we finally get to start screwing down the support braces for the beds base.

The 1st 2 are 6" apart, as this is were most of the were n tear will be with getting in and out of bed.

As these beams are larger than the 3x2 we were using, they are too tall to site upright, 

So the will sit flat, After screwing these 2 supports in place I sat in the middle and raised my legs, and the did not even move a little bit. 

And we have the upright supports still to add yet.
But that will be later on, as I have to make sure we have the room we need for the items that will be stored under the bed.

All in all a good steady day, and you can definitely see what we have done today!.