19th February 2023 - Disco Transit Green Long Wheel base and Hi Roof Conversion

Published on 20 February 2023 at 12:00

Hi Folks.......... Another late start!

Updated - Jobs pencilled in till Sunday

Boy has this list grown !!

Green - Completed job

purple - job in progress

Yellow - Job Description
Blue - new jobs added or not started

 

1. Finish the frame work around the portaloo. - Finished!!
2. Add cross batons to bathroom/kitchen wall. -  Finished!!
3. add sound proofing/insulation to bathroom/kitchen wall. -  Finished!!
4. find position for sink in bathroom. - DONE
5. add extra supports to mount the sink. - hopefully be completed next Monday
6. Panel the bulkhead battery frame work.
7. Area next to passenger door, needs washing and going over with wire wool.
8. Finish adding sound proof pads - Still ongoing, need to move stuff around to get to the rest
9. Insulate Bathroom -  Finished!!
10. Clean old original panels - Lynne has just about washed every panel she can get too so far
11. Glue extra Insulation in the inside of the kitchen panel. -  Finished!!

12. Paint the Kitchen panel - Done 
13. put them back were they belong. - behind Kitchen - done

14. make base for bathroom sink 9mm ply - 

15. Mark out and cut inside bathroom wall 3mm ply - Finished

16. measure and cut 1st roof panel 3mm ply - just some clips to add
17. in 1st roof panel, cut holes for ceiling lights. - DONE
18. run light wires thru roof frame. - Done 12 volt & 220 volt lights & wires. Entrance
19. Finally screw roof panel into place. - Waiting on some panel clips
20. mount bathroom sink extra mounts - 

21. install sink tap & waist pipe - REMOVED to install wall boarding
22. add cross members to the bathroom wall were water pipe mounts will go -  Finished!!
23. re-assemble the framework onto raised toilet area - 
24. measure and cut 3mm panel for behind the toilet -  Finished!!

25. insulate the panel and fix into place -  Finished!!

26. - put bathroom door frame back. - 
27. remove grill from kitchen unit and repair and put back - Removed, Lynne has started washing it.
28. water pumps screw to back of kitchen unit - 
29. remove sink and drainage board - 
30 buy some sealant gaskets for kitchen unit and install - arrived - not yet ready to use
31. refit cooker & sink & drainage board -  
32. move kitchen to its final location - Now within an 1nch
33. bolt the kitchen in place.
34. Glue extra Insulation in the inside of the drivers side rear wheel arch panel. - Done

35. Paint the Drivers side rear wheel panel -  

36 - in workshop behind CBRTIM and get 2 x 3mm 8x4 foot sheets - DONE

37. sand back to top of the bathroom wall, so panels match the upright - Done

38. sand back to bottom of the bathroom wall, so panels match the upright

39. Rear Divers side sound proofed bottom half - done
40. Added DODO insulation and more sound proofing - Done
41. Re use the original Ford Cover and clip/bolt into place - Done

42. needs sanding and prepping for painting white - 
43. Pant the panel - 
44. rear passenger side lower half needs to be washed.
45. sound proof pads need adding

46. DODO sound/insulation needs adding
47. clip/bolt back original Ford panel
48. needs prepping for paint

49. Paint

50. measure and find best position for bed.
51. Start making frame for the bed.
52. add mount points to transit frame for bed frame.

53. bring down mattress and try to see if it fits!!
54. Cover Mattress to protect it.

39. Kev's workshop - Make some brackets and install roof rack on roof of transit. (Funds ring fenced) - Booked in on Tuesday 14th Feb.


39A. Kev's workshop - If time and funds allow, get water tanks installed underneath and plumbed into the back. (have some funds available but I know it will not be enough!) - Booked in on Tuesday 14th Feb.

 

Double Bonus job, to have worked out and cut the bed frame & have it mounted!

Today's work area
We are finally getting round to working on this side on the conversion. 

The right pic, was the last of the work, we done on this side, as the boards were in the way!.
The Left pic, did at least get it's 1st wash..

Wiped down and ready for the sound deadening patches, when it is dry.

Meanwhile, I get on with finishing adding the sound deadening patches were they are needed.

Just a few more and this finishes the ceiling.

which is now ready for the DODO Sound Deadening/insulator later on.

Lynne AS USUAL IS DOING A GREAT JOBS, WASHING THESE PANELS DOWN!

They are not taking long to dry now, as what we have insulated so far has dried out the air somewhat and it's now a lot warmer inside as well.

We have not have to have the heater on for a week now :) :) 

First job we do is to insulate the wheel arch.
As we had run out of the handy sized patches, today's black insulator is all on a roll, so we have to cut it down to manageable sizes.
But it was quite a bit cheaper than the rectangular patches, and was starting to feel the strain on the bank balance, so every penny saved, keeps the project rolling on. 

The 1st 2 areas are given there 1st layer on insulation

and the next parts soon follow.

On 1 panel we used all off-cuts as we were getting to many of them.

That's the whole side insulated with the 1st layer...

In goes a double layer of DODO sound reducer & insulation

Lynne n me discussing our next moves and ideas as we both chill for 5 mins

We get the original board and slide it into place.
What we had not noticed on removing it, was that someone has but a section off it, so the board is now not tall enough!

We are gonna have a serious think about it whilst we go in for Dinner..

Altho we did not get back out after dinner, 
I was in just too much pain and feeling dizzy n disorientated, that I just went to bed.

I am just hoping that tomorrow, things will go as smoothly as possible, but I know it is gonna be a long day without Lynne there to help and chat n laugh with..
 