Hi Folks.... - Sadly due to Ken's health we have had to pospone today!

I will give him a ring on Monday to see if he is well enought to work.

So after a while of the black dog nipping at my heals, I decided to get of my lazy arse and get into the transit, and do some work.

Now I know I am still not really well enough to be working on the conversion, but I need to shut the black dog up!!

No plans, as I will be resting as much as I can, so anything I can get done today will be a bonus...

Updated - Jobs pencilled in till Sunday

Boy has this list grown !!

I will delete completed jobs a week after they are finished !

Green - Completed job

purple - job in progress

Yellow - Job Description
Blue - new jobs added or not started

 

 

1. Buy more 2x3 from Andrews - Done 07/03

2. Buy some Router bits - Done 19/03

3. Measure & cut storage hole in 9mm ply for bed - started 24/03

4. Fit & secure bed front 9mm panel - started 18/03

5. add extra supports to mount the sink. - hopefully be completed next Monday
6. Panel the bulkhead battery frame work.
7. give all wood below the bed it's 2nd and final coat of paint.

8. Get MDF from old bed from green shed and cut to fit the bed frame - 

9. measure and cut the 3mm 3 ply sheet for the 2nd ceiling panel.

10. need some material for bed header cover - use some DODO insulation as filler - 

11. Paint Bathroom wall - Started 16/03

12. Make up back sink panel - Started 16/03

13. inside kitchen cupboard by bed, need strengthening, so we can bolt the kitchen and the bed together -  Started 11/03

14. make base for bathroom sink 9mm ply - 

15. Paint bathroom sink back board - started 16/03

16. measure and cut 1st roof panel 3mm ply - just some clips to add
17. Finally screw roof panel into place. - Panel clips have arrived
18. install sink tap & waist pipe - REMOVED to install wall boarding

18A. 2nd panel run light wires thru roof frame. - 

18B. 3rd panel run light wires thru roof frame. - 

18C. 4th Panel run light wires thru roof frame. - 
19. scobby doo's for blue cover for Mattress to protect it. BROUGHT 10/03
20. mount bathroom sink extra mounts - 

21. bring mattress down, when bed frame is made

22. add mount points to transit frame for bed frame - started 11/03

23. re-assemble the framework onto raised toilet area - 
24. sand back to bottom of the bathroom wall, so panels match the upright

25. Paint the Drivers side rear wheel panel -  Started 19th/03

26. - put bathroom door frame back. - 
27. remove grill from kitchen unit and repair and put back - Removed, Lynne has started washing it.
28. water pumps screw to back of kitchen unit - 
29. remove sink and drainage board - 
30 buy some sealant gaskets for kitchen unit and install - arrived - not yet ready to use
31. refit cooker & sink & drainage board -  
32. Add Dodo insulation to were 2nd ceiling panel will go.
33. bolt the kitchen in place. - Started 11/03
34. screw /clip 2nd ceiling panel into place.

35. drivers side wheel wheel build framework & board over - Started 26/02 Framework finished - Just needs boarding.

37. Passenger side wheel wheel build framework & board over - Started 02/03

38. Cut passenger side floor batton. Done 24/03

39. the last 9mm ply sheet, cut n make small ottoman 

40. Also measure n make foldible table.
41. Cut out storage hole in bed side panel. - Started 24/03

42. needs sanding and prepping for painting white - 
43. Paint the panel - 
44. Buy large tin of white silk paint - done 10/03
45. cut 5 lengths for bed support - DONE 11/03

46. Paint the 5 lengths bed support - Done 18/03
47. Add guide lines for storage containers to floor - 
48. needs prepping for paint

49. Paint

50. paint under the bed walls and framework - started 11/03
51. Buy some sticking vinyl sheet for collapsible table.
52. Buy extra Containers needed for under bed storage. - DONE 20/03

53. Measure area and test fit Generator (remove when tested) -
54. add vinyl sheeting to table top.
55. Mount collapsible table to small Ottoman

39. Kev's workshop - Make some brackets and install roof rack on roof of transit. (Funds ring fenced) - Booked in on Friday 24th March.


39A. Kev's workshop - If time and funds allow, get water tanks installed underneath and plumbed into the back. (have some funds available but I know it will not be enough!) - Booked in on Friday 24th March.

 

Double Bonus job, to have worked out and cut the bed frame & have it mounted!

 

I need to have a tidy up as I cannot get thru to the bed !

Have finally got the bed frame basically all screwed into place.
Still some painting to do
and some supports to add 

I have measured the hole and marked it on the bed front.

But as I am on my own, I will start to screw the bed side board to the frame work and hope that will secure the board enough that id allows for a nice smooth cutting.

After sliding the 2 sheets of ply part way out the side door

I now have clear access all round the hole I have marked up.

I had great issue staying close to the line, as my eyeside kept fading in and out, so plenty of work to square it all up!!

This side seems to be the worse by a long way!!

Time to clean up the edges a bit, so that I can remark straight lines for the planer....

I think the new line is ok, but I think I will leave it and get Lynne to double check it all tomorrow.....