Hi Folks. - Feeling a little better today,
At least balence wise, I just hope it stays that way, as the day progresses...
as the day woe on my eyesight and balncance go tworse n worse, until I was forced into bed for safety reasons
Updated - Jobs pencilled in till Sunday
Boy has this list grown !!
I will delete completed jobs a week after they are finished !
Green - Completed job
purple - job in progress
Yellow - Job Description
Blue - new jobs added or not started
1. Buy more 2x3 from Andrews - Done 07/03
2. Buy some Router bits - Done 19/03
3. Measure & cut storage hole in 9mm ply for bed - started 24/03
4. Fit & secure bed front 9mm panel - started 18/03
5. add extra supports to mount the sink. - hopefully be completed next Monday
6. Panel the bulkhead battery frame work.
7. give all wood below the bed it's 2nd and final coat of paint.
8. Get MDF from old bed from green shed and cut to fit the bed frame -
9. measure and cut the 3mm 3 ply sheet for the 2nd ceiling panel. started 25/03
9A. using off-cuts find and screw into place bed supports spacers and edges of the bed frame - 25/03
10. need some material for bed header cover - use some DODO insulation as filler -
11. Paint Bathroom wall - Started 16/03
12. Make up back sink panel - Started 16/03
13. inside kitchen cupboard by bed, need strengthening, so we can bolt the kitchen and the bed together - Started 11/03
14. make base for bathroom sink 9mm ply -
15. Paint bathroom sink back board - started 16/03
16. measure and cut 1st roof panel 3mm ply - just some clips to add
17. Finally screw roof panel into place. - Panel clips have arrived
18. install sink tap & waist pipe - REMOVED to install wall boarding
18A. 2nd panel run light wires thru roof frame. -
18B. 3rd panel run light wires thru roof frame. -
18C. 4th Panel run light wires thru roof frame. -
19. scobby doo's for blue cover for Mattress to protect it. BROUGHT 10/03
20. mount bathroom sink extra mounts -
21. bring mattress down, when bed frame is made
22. add mount points to transit frame for bed frame - started 11/03
23. re-assemble the framework onto raised toilet area -
24. sand back to bottom of the bathroom wall, so panels match the upright
25. Paint the Drivers side rear wheel panel - Started 19th/03
26. - put bathroom door frame back. -
27. remove grill from kitchen unit and repair and put back - Removed, Lynne has started washing it.
28. water pumps screw to back of kitchen unit -
29. remove sink and drainage board -
30 buy some sealant gaskets for kitchen unit and install - arrived - not yet ready to use
31. refit cooker & sink & drainage board -
32. Add Dodo insulation to were 2nd ceiling panel will go.
33. bolt the kitchen in place. - Started 11/03
34. screw /clip 2nd ceiling panel into place.
35. drivers side wheel wheel build framework & board over - Started 26/02 Framework finished - Just needs boarding.
37. Passenger side wheel wheel build framework & board over - Started 02/03
38. Cut passenger side floor batton. Done 24/03
39. the last 9mm ply sheet, cut n make small ottoman
40. Also measure n make foldible table.
41. Cut out storage hole in bed side panel. - Started 24/03
42. needs sanding and prepping for painting white -
43. Paint the panel -
44. Buy large tin of white silk paint - done 10/03
45. cut 5 lengths for bed support - DONE 11/03
46. Paint the 5 lengths bed support - Done 18/03
47. Add guide lines for storage containers to floor -
48. needs prepping for paint
49. Paint
50. paint under the bed walls and framework - started 11/03
51. Buy some sticking vinyl sheet for collapsible table. Done 19/03
52. Buy extra Containers needed for under bed storage. - DONE 20/03
53. Measure area and test fit Generator (remove when tested) -
54. add vinyl sheeting to table top.
55. Mount collapsible table to small Ottoman
39. Kev's workshop - Make some brackets and install roof rack on roof of transit. (Funds ring fenced) - Booked in on Friday 24th March.
39A. Kev's workshop - If time and funds allow, get water tanks installed underneath and plumbed into the back. (have some funds available but I know it will not be enough!) - Booked in on Friday 24th March.
Measurements for the 2nd ceiling 3mm ply board, I could not find our note pad, that we would normally put this info into............
The pencil line is the edge of the Mattress should sit, We will know for sure hopefully tomorrow.
From our Off-Cuts bag, just needed a couple of MM taken off.
This Offcut, dropped straight in !
removed 1" from this Off-Cutt...
And finally for this side, this Off-Cut went in with a gentle tap....
Now to start on the other side, another small Off-Cut drops straight in......
Gotta take a break hear due to the med alarms going off on Kindle & Moby.
Plus I have had another waterworks accident!.
So i went back in the house, and just after I came out of the bathroom Emma, Timmy, Iiam & Michael are at the back door, and said tea is on its way,
So I sat down and chilled with them all.
After Tea I got up, and went to put my uneaten pie in the fridge, but the kitchen door saved me from falling down, altho It did bend some, so I will check that in the morning.
My Balance is totally shot, so instead of going back out and doing more work on the transit, I have been ordered to bed!!.
Add comment
Comments