Hi Folks...
Another day dawns upon us, and the work continues.
Updated - Jobs pencilled in till Sunday
(when busy with other things about the house, so probably will not have time to get on with the conversion).
1. Finish the frame work around the portaloo. - STILL ONGOING
2. Add cross batons to bathroom/kitchen wall. - STARTED yESTERDAY
3. add sound proofing/insulation to bathroom/kitchen wall.
4. find position for sink in bathroom. - STARTED yESTERDAY
5. add extra supports to mount the sink.
6. Panel the bulkhead battery frame work.
7. Area next to passenger door, needs washing and going over with wire wool.
8. Finish adding sound proof pads
9. Insulate it.
10. Clean old original panels
11. Glue extra Insulation in the inside of the panels.
12. Paint the panels
13. put them back were they belong.
Double Bonus job, to have worked out and cut the bed frame & have it mounted!
Some items have arrived, that I brought some 2 weeks ago and were delayed...
6 x 400ml CARPRIDE Underseal Spray Paint Car Under Body Seal Protection.
Ready for when we drill all those holes in the floor and chassis!
The Original Acid Neutralising Battery Mat. Absorbs acid & dampens vibration
Altho I already using old foam matting from old floor,
these will sit under each battery to protect the foam matt and provide that little bit extra padding..
10 Sheets Sound Deadening Damping Mat 5mm Car Silent Compact Van Proofing Pack
I have already used 10 sheets and probably will need more!.
But makes a huge difference when the rain hits the roof and sides, of the areas we have put this already.
Campervan Folding Bracket Table Extension Shelf Motorhome Caravan Wall Hinges.
just waiting on me to decide where the folding table will go..
Home Safety Pack | FireShield 1KG Dry Powder Fire Extinguisher & 1m x 1m Soft Case Fire Blanket.
ready for when we get the kitchen area sorted.
wilko Pure Brilliant White Satin Quick Dry Interior Wood and Metal Paint, Quick Dry Paint, Satin Finish Paint, Touch Dry in 2 Hours, 750ml.
Hoping to start using last thing tonight, as the bathroom portaloo area is almost finished.
It is just there to protect the wood from spillages and to make cleaning the wood, that much easier & quicker..
50pcs Bonnet Insulation Retainer Clips Fastener Door Panel Trim Clips Compatible with Ford Mondeo Fiesta Transit 6448410 W700671S300 6678518 8mm Hole Diameter 12.7mm Depth.
Ordered these 2 days ago £3.99 for 50...
As hoping to start on some of the panelling next week, and will make use of existing holes.
Right my main area of work, once again.
I am trying to get it ready to get the portaloo floor & storage area painted later today.
So I am hoping for no hold ups or running out of vital items, I need to achieve my goal.
In goes the screws thru the bracket,
I have removed the bracket from the other end,
as I am fast running out of them :( :(
And I have screwed thru the upright instead with some 6" long screws.
Next cross member soon follows the last one, with the same way of screwing to to the uprights.
The top cross member soon follows the last one, with the same way of screwing to to the uprights.
Before I add 2 more cross members in here, I need to check the kitchen cupboard, to make sure I have easy access to screw it to the cross braces.
Also bathroom side, I need to find out were the water pipes will want to go, so they do not fowl each other and make things harder for me.
This section, will be next to do.
Luckily yesterday & today have SOLD a couple of items, not for much, but enough to get some screws & Brackets that I am fast running out off..
In fact when I go back out to the transit, I will unplug, and make sure everything is safe in the back and head down to Andrews Timber.
Which will hopefully mean I can carry on until I am falling asleep of in that much pain I am forced to take a break...
Back from Andrews Timber and cleared them out of this size L Brackets :) :)
At just under half price of what I can buy them online, plus it means I can carry on today.
Only brought 1 box, as money is very tight
And finally 10 x 1" x 1" batons.
Just waiting to be put away...
MMM I think a good cleanup time is coming real soon, I had not realised how messy the van had become.
Back into the bathroom and the top cross brace is screwed into place
The next Cross brace down, is not so easy , as the bolts got in the way, meaning these cross members are staggered.
Not an issue tho as I can add another bit of 3x2 to each cross member giving me roughly a straight line :) :)
The next cross member is for the sink mounts, so like the one below it it is doubled up & screwed together..
mmmmmmmmmmmmmmmmmm
If I remove this cross member I can put a screw in the other cross member and then put this back :) :)
That is it temporarily removed,
Dam gotta go in doors, and wash n change.
This is really starting to piss me off now !
It seems just as I get into a nice comfortable rhythm, my water works fucks it all up, and it is difficult to re-find that nice rhythm !!
Lynne is home, and we are discussing options for mounting the sink.
we also discuss plans for Saturday, and we are thinking it is time for me to have a break from the bathroom, as we would like to get the kitchen unit altered and bolted into place.
This will then allow me to make up mounts/shelves for the hot water system and other pipework.